What We Do

Services

Every job we quote, broken down so you know what you're paying for.

HomeServices

Everything we take on

Every job below is one we do ourselves across Sidney.

Deck Installation

We frame new decks with joists spaced to match whatever decking you pick, sixteen inches on center for most composite boards, twelve for some thinner options. Footings go below the frost line and we bolt the ledger through the rim joist with flashing behind it, not just nails and hope.

Deck Repair

We fix boards that have gone soft, sistered joists that have started to sag, and railings that shake when you lean on them. Sometimes the frame is fine and it's really just the ledger connection that's failed, which is a smaller job than most people expect.

Deck Staining & Sealing

Pressure-treated wood should get a fresh coat every one to two years around here, since Ohio winters freeze water into the grain and summer sun bakes it back out. We pressure wash first, let the wood dry for a couple of days, then seal it before the next freeze-thaw cycle gets at it.

Custom Deck Design

Multi-level decks, built-in benches, hidden storage under the stairs, we'll draw it out before we cut anything. We work around what your yard actually does, not just a square box off the back door.

Deck Railing Installation

Baluster spacing has to stay under four inches under Ohio residential code, and we build to that whether or not the deck needs a permit. Cable rail, aluminum, wood, we set the posts so they don't wiggle after the first winter.

Composite Decking Installation

Composite boards don't rot, but they still need the joist spacing and hidden fastener system specced for that brand, or the boards bow between the clips. We install with the manufacturer's hardware so the warranty actually holds if something goes wrong.

Deck Board Replacement

Sometimes it's only a handful of boards gone soft or cupped, not the whole deck. We match the board size and pattern so the repair doesn't stand out against the rest of the surface.

Deck Demolition & Removal

An old deck that's rotted through the frame usually isn't worth patching. We tear it down to the ledger, haul off the lumber, and clear the footings if you want a fresh layout instead of rebuilding on the old one.

Screened-In Deck Additions

A lot of deck customers end up asking about screening part of it in once the bugs show up in June. We can frame a screened section onto an existing deck or build it into a new one from the start.

Pre-Sale Deck Inspection

If a deck was built without a permit years ago, a home inspector will usually flag it during a sale. We check the ledger connection, footing depth and railing height, and give you a written list of what needs to change to pass.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Sidney, OH

Coverage stretches roughly fifty miles out from Sidney.

Sidney, OH
Springfield, OH
Troy, OH
Piqua, OH
Vandalia, OH
Bellefontaine, OH
Greenville, OH
Urbana, OH
Tipp City, OH
Wapakoneta, OH
St. Marys, OH
Common Questions

Things worth asking

What comes up once a project actually starts.

Do I need a permit to build a deck?
Most Ohio municipalities require a permit for a deck attached to the house or built more than thirty inches above grade. Ground-level platform decks under that height sometimes don't need one, but local code varies enough that it's worth checking before assuming.
How long does it take to build a deck?
A standard single-level deck usually takes three to five working days once material is on site, longer if stairs, multiple levels or built-in features are involved. Weather delays, especially rain on footing day, are the most common reason a timeline slips.
Can a deck be built to fit a set budget?
Decking material is usually the biggest lever, since pressure-treated pine costs significantly less per square foot than composite boards. Square footage, railing style and number of stairs also get adjusted to hit a target number without cutting corners on the frame underneath.
Is deck work guaranteed?
Workmanship on deck installation and repair is guaranteed against defects for a set period, spelled out in the written quote. Manufacturer warranties on composite decking and hardware are separate and get passed through directly from the manufacturer.
Who will I be dealing with during the project?
One point of contact handles scheduling and questions during a deck build, rather than switching between different people. Day-to-day work on site is done by the same crew from start to finish.
What decking materials are available?
Pressure-treated pine, cedar and composite boards from brands like Trex and TimberTech are the most common choices. Pine costs less up front but has to be stained every one to two years, while composite costs more but only takes an occasional wash.
Can I still use my yard while the deck is being built?
Most of the yard stays usable during a deck build, though the immediate work area needs to stay clear for safety and material staging. Access for concrete trucks or equipment on footing day is the main thing to plan around.
What do I need to do to prepare before work starts?
Clearing furniture, grills and planters off the existing deck or build area is the main prep needed before a crew arrives. Marking the location of buried irrigation lines, dog fence wire or lighting cable ahead of time avoids delays once footing holes get dug.
What happens if you find rot or a bad footing once the old deck comes off?
Hidden rot in the ledger board or rim joist is common once old decking comes off, especially on decks over fifteen years old. If that turns up, the scope and cost get discussed before any additional work happens, not added to the bill as a surprise.
How do I take care of a new deck once it's built?
Pressure-treated wood should get a fresh coat of sealant every one to two years and a yearly pressure wash to keep mildew from taking hold. Composite decking only takes an occasional wash with soap and water, but the gaps between boards should stay clear of leaves so water can drain.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (937) 870-3161